Drywall installation has begun, and poles for permanent power being installed!
Photos, left to right: Drywall and insulation being put in; Welders welding I-beam for speakers and stage lighting; Pouring light pole bases; One of the back sidewalks was poured to have a place for AC units; Back sidewalk poured; Getting standing seam sheets ready to go on roof; Extra storage area; View of street side of church; Welding is completed in sanctuary; Parapet wall getting finished up and decked by the roofers; Mechanical mezzanine floor joist being installed above 2nd floor; Duct work; CoServ is setting poles for permanent power to site; Light pole base is poured and ready for pole installation.