Weekly Update 9/17/26

Glass and more electrical work this week!
Photos, left to right: Door and window frames getting installed at front lobby entrance; Main meter can and electrical disconnect all ready for wire to be pulled; Glass getting installed; New tech wood soffit being installed; Conduit being run under the stage from electrical room to other areas.
Posted in