Weekly Update 10/8/26

Power is on, building is completely sealed up, and AC is running!
Photos, left to right: Lighting getting installed in sanctuary ceiling; Transformer all terminated and ready to energize; Meter is in. Turning on power today; HVAC diffusers going in, in the sanctuary ceiling; Front entry all installed; A/C units for first floor all up and running. Cool air!!; Drywall finally all up behind alter. Ready for stone.
Posted in